Air Cam Builder's Log | AIR CAM BUILDER'S LOG | VERTICAL STABILIZER | IMG_9332

IMG_9332
Drilling the ceremonial very first hole in the VS. The VS arrives held together with temporary rivets. All of the holes are then step drilled twice, and then the parts are disassembled, deburred, prepped and primered. After that everything is clecoed back together and then riveted.

Tags:
Gallery RSS RSS Feed | Archive View | Powered by Zenphoto